“The expense of constructing a caustic soda production plant in South Africa is about R2 billion and the most recent attempt to build a plant in Port Elizabeth was cancelled due to unstable energy supply and other variables. As a result, capability boosts are constrained and extra demand (any need outside of domestic creation potential) has to be